Please use this identifier to cite or link to this item:
https://idr.l1.nitk.ac.in/jspui/handle/123456789/10060
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Naik, S.R. | |
dc.contributor.author | Sastry, V.R. | |
dc.date.accessioned | 2020-03-31T08:18:34Z | - |
dc.date.available | 2020-03-31T08:18:34Z | - |
dc.date.issued | 2014 | |
dc.identifier.citation | International Journal of Earth Sciences and Engineering, 2014, Vol.7, 4, pp.1601-1610 | en_US |
dc.identifier.uri | http://idr.nitk.ac.in/jspui/handle/123456789/10060 | - |
dc.description.abstract | Construction of large underground caverns in Himalayas is challenging due to complex geological and insitu stress conditions. Understanding the behaviour of such caverns during construction stage is possible only with extensive instrumentation. A case study of a large cavern under construction in Himalayan region in Bhutan is considered. Results from various types of instruments are discussed in this paper. Instrumentation data shows that Himalayan rock mass particularly with phyllitic quartzite exhibits large deformations thus requiring careful selection of support and excavation methodology. 2014 CAFET-INNOVA TECHNICAL SOCIETY. | en_US |
dc.title | Behaviour of large underground cavern during construction in himalayas - a case study | en_US |
dc.type | Article | en_US |
Appears in Collections: | 1. Journal Articles |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.