Please use this identifier to cite or link to this item: https://idr.l1.nitk.ac.in/jspui/handle/123456789/10471
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSharma, M.-
dc.contributor.authorKoppal, P.V.-
dc.date.accessioned2020-03-31T08:19:16Z-
dc.date.available2020-03-31T08:19:16Z-
dc.date.issued2010-
dc.identifier.citationAdvances in Electrical and Computer Engineering, 2010, Vol.10, 2, pp.135-140en_US
dc.identifier.urihttp://idr.nitk.ac.in/jspui/handle/123456789/10471-
dc.description.abstractThe recent trends in electrical power distribution system operation and management are aimed at improving system conditions in order to render good service to the customer. The reforms in distribution sector have given major scope for employment of distributed generation (DG) resources which will boost the system performance. This paper proposes a heuristic technique for allocation of distribution generation source in a distribution system. The allocation is determined based on overall improvement in network performance parameters like reduction in system losses, improvement in voltage stability, improvement in voltage profile. The proposed Network Performance Enhancement Index (NPEI) along with the heuristic rules facilitate determination of feasible location and corresponding capacity of DG source. A Priority list is prepared with decreasing values of NPEI so that the designer can select most feasible location. The developed approach is tested with different test systems to ascertain its effectiveness. 2010 AECE.en_US
dc.titleAssessment of distributed generation source impact on electrical distribution system performanceen_US
dc.typeArticleen_US
Appears in Collections:1. Journal Articles

Files in This Item:
File Description SizeFormat 
10471.pdf616.89 kBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.